What does a Schedule of Condition include?

A properly prepared Schedule of Condition combines a written element-by-element record of existing condition with a dated, cross-referenced photographic record, issued in lease-ready format suitable for appending to the executed lease.

Author
CBC Surveyors
Updated
Updated 2025
Reading time
6 min read

Overview

The deliverable is a single, integrated document, not a separate report and gallery. Below: each element, why it's there, and what it looks like in practice.

1 · Site inspection by an experienced specialist surveyor

Every CBC Schedule of Condition begins with a methodical on-site inspection by an experienced specialist surveyor, externally and internally, across the entire demise. The inspection is the foundation of every other element of the deliverable.

2 · Element-by-element written schedule

The written schedule records the condition of every relevant element of the demise: external walls, roof, windows and doors, internal walls and ceilings, floors and floor coverings, mechanical and electrical installations (visual record only), sanitary and welfare, external areas where applicable. Each element is described in objective terms with notes on existing defects and wear.

3 · Dated photographic record

High-resolution, dated photography cross-referenced to the written schedule is the evidential core of the document. Photographs are positioned to support the written description, not to replace it.

4 · Lease-ready format

The Schedule of Condition is delivered in a format ready to append to the executed lease and reference in the repairing covenant. Solicitors receive the document in a form they can use directly, without re-formatting, re-paginating or re-issuing.

Key takeaways

What to remember

  • 01Inspection by an experienced specialist surveyor is the foundation of every other element.
  • 02The written schedule is element-by-element, not a generalised description.
  • 03Photography is dated and cross-referenced to the written schedule.
  • 04Delivery is in lease-ready format, appendable to the executed lease.
Common questions

Frequently asked

Start your enquiry

Talk to a Schedule of Condition specialist

Send a brief and we will respond the same working day with a fixed quote and indicative timescales.

Get a Quote